久草在线成人,91一级黄色视频,亚洲综合性爱AV,欧美卡一卡二,91性爱视频网站

Your present position:Home >> Use and Maintenance of Air-jet Loom
Use and Maintenance of Air-jet Loom
Time:[2019-8-7]    Pageview:9246

Use and maintenance of air-jet looms:

I. Periodic Maintenance

1.Daily maintenance and handling

Maintenance workers need to carry out routine maintenance of electric oil pump, centralized oil supply, heat dissipation part of main motor, input shaft of open cam box, electromagnetic brake, weft detector, scissors, winch, side brace and edge-trapping yarn.

2.Maintenance and disposal of machine time

Check whether the side brace ring rotates flexibly, whether it is worn, whether there are flying flowers, whether the interval between stop pin and main drum is 0.5 mm, whether the air pipe leaks, whether the centralized oil supply leaks, whether the oil pipe is damaged or bent, whether there are flying flowers in the control box, confirm whether the height error of the heald frame is less than 2 mm, and whether the air filter exhausts. Whether the pipe is unblocked, whether there are flying flowers on the pinion of the warp shaft, whether there is yarn head on the bevel gear shaft of the opening device, whether the screen hole on the oil filter is blocked, whether yarn head is rolled on the warp let-off and loosening axles, whether there is damage to the insulating sleeve of the wire and whether the clearance of the brake is correct. Fuel the nozzle, the gear face and chain of the open gear, and check whether the heald frame and the guide plate of the heald frame are worn or not.

3.Half-yearly overhaul and treatment

It is necessary to check whether the winding is clean, whether there are yarn marks and scars on the main drum and pin drum, whether the inside of the stop pin assembly is dirty, whether the open wire rope is elongated or damaged, whether the recovery spring is damaged, and whether the bearing of the open wire rope connecting seat is worn. Whether the belt tension is appropriate or not, whether there is damage, whether the sensors are working properly, whether the transmission gear box, coiling gear box and sending gear box are replaced with lubricating oil, whether the filter sieve is blocked, whether the reed is stained with dirt, whether the wind speed value is normal, and whether the U-shaped shaft lining of the pull-down hook is normal. Whether the wear is less than 2 mm, whether the main nozzle duct is bent, whether the coiling roller chain is elongated, whether the clearance between planetary gears is normal, whether the wear of the axle lining of the planetary tube seat is less than O.5 mm, whether the wear of the axle lining of the planetary tube is less than 0.5 mm, whether the wear of the axle lining of the planetary tube is less than O.5 mm, whether the auxiliary nozzle is scratched or not. There are yarn marks, whether bending or not, whether there is oil in the scissors device, and so on.

4.One-year overhaul and disposal

Whether the screw of the support foot of the main nozzle is loose or not, the screw should be tightened again.

5.Overhaul and disposal in two years

Whether the winding roll, pressing roll and rough rubber are worn, whether the warp and warp parts of the warp axle are worn within 0.3 mm, whether the buffer performance is reduced, whether the nylon bushing and the guide pin column of the buffer are worn, whether the auxiliary nozzle is dirty, whether the weft is cut correctly by the side shearing device of the yarn supply, whether the stop pin hole of the stop pin assembly is worn or not. Whether the wear of the roll shaft of the coiling cloth is less than 0.5 mm or not is less than 0.5 mm.

6.Overhaul and disposal in three years

Whether the lubricating oil of solenoid valve is insufficient and whether the coiling cloth roll rotates flexibly.

7.Seven-year overhaul

It includes the maintenance of bearings, oil seals, gears, cams, axle linings, stop pins, main motors, frame, opening, warp feeding, winding and weft storage parts.

二、Contents and Notices to be Preserved by Loom Institutions after Long-term Use

(1)Main transmission part: After long-term use of the loom, it is necessary to replace the oil seal of the crankshaft bearing seat of the driving part.

(2)Opening part: It is necessary to replace the cam open arm bearing, wire rope, heald spring and heald arm bearing.

(3)Replacement of synchronous toothed belt and cleaning of oil filter.

(4)Clean reed regularly.

(5)The inner parts of the length measuring and weft storage drum are replaced, the inner parts of the stop pin are replaced, and the encoder is cleaned.

(6)Main nozzle cleaning, filter cleaning, cleaning and repair of solenoid valve and pressure regulating valve, inspection and configuration of gas pipe.

(7)Servo motor maintenance and replacement, buffer repair and internal parts replacement.

(8)Check coiling brake rollers, chains, tensioning wheels, adjusting pins and replacement, maintenance and replacement of friction discs and discs. Inspection and replacement of rough rubber.

(9)Check and replace planetary gear, tube bearing, guide arm shaft and coupling.

(10)Inspection and replacement of weft detection cable

Previous: 暂无

Next: 喷气织机:卖点在于低耗

a级无码大片| 青青草人人爱| A级片网址| 日韩黄色三级A片| 五月天一级AV| A片Av在线观看| av一级片免费看| 少妇黄色网| 三级片WWW、C| 五月天婷婷毛片| 亚洲AV在线免费| 国产人人插| 日韩AV日韩| 怡红院视频99| 2008av天堂| 最新AV在线观看| av一级片免费看| 黄色免费网站w| 真人一级黄色片| 岛国熟女av免费看| 免费手机av| 日本黄在线免| 亚洲污视频在线观看| 国产精品一页| 成人午夜毛片| 成人在线日本a片| 777超碰| 一级黄色视频免费看| 动漫AV网| 婷婷五月天黄色的| 成人片超碰| 看av无码| 亚洲最新av| av久日| 黄色电影A| 亚洲A√一级黄电影| 少妇性爱在线视频| 久操91| av小网站| 超碰影音97| 亚洲黄色特级|